주요 프로젝트
CEG Construction은 규모와 범위를 모두 아우르는 프로젝트에서 전 세계의 고객 및 공동 작업자와 협력하는 즐거움을 누 렸습니다. 모든 노력에서 우리는 비용 효율성과 건설 기간의 균형을 맞추고 모든 작업을 수행하고 잘 작동하는 데 필요한 사항에 대한 강력한 지식을 갖추고 있습니다. 우리의 주요 프로젝트는 현재까지 건설 된 가장 주목할만한 프로젝트 중 일부를 나타냅니다.
58,480 sq. ft.
(3) Story Concrete Tilt-Up Warehouse/Office Building situated on a 2.04 A.C. site with panels spanning over 60-ft in height. First-floor warehouse and office footprint = 40,416 S.F. Second-floor office and flex space footprint = 9,032 S.F. Third floor office footprint = 9,032 S.F.
• 32' clear height
• (6) dock high and (1) grade level loading positions
• (68) parking stalls
• ESFR sprinkler system
• 2,000 amps of power
60,000 sq. ft.
60,000 sq. ft. cold storage distribution with 8" thick insulated panels and (3) freezers.
22,000 sq. ft.
2102 Merced, South El Monte is a 22,000 sq. ft. fully automated -10 degree freezer building storing food for Trader Joes. The attached CMU structure is a (2) story office with a climate controlled loading dock.
98,825 sq. ft.
98,825 sq. ft. four-story creative office space with 199 parking stalls and a roof top amenity center for tenants.
62,441 sq. ft.
Two buildings with office and warehouse space. Burke: 31,539 sq. ft.; Dice: 30,902 sq. ft..
197,614 sq. ft.
Three buildings with twenty individual units ranging from 6,132 sq. ft. to 15,367 sq. ft.
Building 1: 39,422 sq. ft., 6 units
Building 2: 107, 414 sq. ft., 8 units
Building 3: 50,778 sq. ft., 6 units
144,000 sq. ft.
Five buildings with office mezzanine and warehouse space. Building 4310: 36,227 sq. ft. Building 4320: 33,164 sq. ft. Building 4330: 25,711 sq. ft. Building 4340: 27,413 sq. ft. Building 4350: 21,484 sq. ft.
43,442 sq. ft.
4328 Alcoa is an office/warehouse with freezer/cooler facilities and processing rooms.
420,000 sq. ft.
The Alameda Industrial Park is a (4) building, ±420,000 SF next-generation industrial speculative development in the heart of Los Angeles. Situated within the 10, 110, 5, 60, and 710 Freeway mega-convergence, Alameda Industrial is located atop the most valuable industrial real estate in the United States. Employing the latest in industrial design and construction methodology, these concrete tilt-up warehouse facilities come equipped with covered loading docks, concrete site paving, 33' high ceilings, ESFR fire suppression systems, automatic dock levelers, high-efficiency commercial solar panels, and a suite of next-generation technology like LED warehouse lighting and electric HVAC and water heaters that lessen the facilities' overall carbon footprint.
N/A
NRMCC's new concrete ready mixed facility has over 1,000 tons of gravity cement storage, 5,000 tons of live aggregate storage and is capable of producing over 4,000 cubic yards per day.
N/A
Aerospace facility for the production of the fuel tanks for the Atlas V Rocket.